Cement Ball Mill test operation precautions

             

The Cement Ball Mill is the key equipment for crushing the material after it has been crushed. This type of grinding machine is equipped with a certain number of steel balls as grinding media in its cylinder. It is widely used in the production of cement, silicate products, new building materials, refractory materials, fertilizers, black and non-ferrous metal dressings and glass ceramics, dry or wet grinding of various ores and other grindable materials. The Cement Ball Mill is suitable for grinding various ores and other materials. It is widely used in mineral processing, building materials and chemical industries. It can be divided into dry and wet grinding methods. According to different mining methods, it can be divided into two types: grid type and overflow type.

The Cement Ball Mill has to go through several important stages from the production of the supplier to the official work. It is the installation-test run (test machine)-load test run-formal production, which is a must for a Cement Ball Mill. the road! The Cement Ball Mill from our company will introduce the precautions for the Cement Ball Mill test operation. What should be paid attention to before the Cement Ball Mill test machine?

1. According to the requirements of the drawings, inject lubricant into the two main bearings and reducer; inject lubricant into the gear cover, the oil level is determined according to the following principle: the large gear is immersed in the oil surface and try to add 15mm to a full tooth height;

2. Check that all lubricants have been installed;

3. During the test run in winter, the lubricating oil of each part should be heated before the test run to avoid the oil solidification affecting the normal operation of the equipment;

4. Check the cooling water system, whether the water is unblocked, and whether the pipeline has water leakage or water seepage;

5. Check that all parts with orientation are in compliance with the installation requirements;

6. Check whether the connecting bolts and anchor bolts of the institute are tightened;

7. The sealing parts should be well sealed, and the friction between metals should not be allowed;

8. All relevant instruments, lighting and signal devices should be intact and in good condition;

9. The motor and control system should be installed well;

10. All ancillary equipment should be in normal operation;

11. The material in the silo should have sufficient reserves;

12. During the test run, the operators should be in a safe area, there should be no leftovers inside the equipment, and there should be no obstructing objects around the equipment.

For the above various considerations, we hope that our customers and friends can strictly abide by, so that we can exert the great power of Cement Ball Mill and bring you better benefits.